A123 Systems To Supply Batteries for eStar Electric Vehicle

A123 Systems (Nasdaq:AONE), a U.S. manufacturer of lithium ion batteries and systems, announced a production agreement with Navistar, Inc. (NYSE: NAV) to supply battery systems for electric vehicles (EVs) for the Navistar-Modec EV Alliance, LLC, a joint venture between Navistar and Modec Limited of the U.K.

A123 will manufacture battery systems for Navistar’s eStar electric delivery vehicle at its Livonia, Michigan facility. A number of vehicles have already been shipped to Federal Express as part of the earlier development agreement. The work is partially funded by American Recovery and Reinvestment Act (ARRA) funding, administered by the U.S. Department of Energy.

Rather than converting an existing, conventional fossil fuel powered truck, Navistar’s eStar truck is a commercial electric vehicle that is purpose-built to be electric as it balances the needs of business and the environment. With zero tailpipe emissions, the Navistar electric vehicle can potentially reduce greenhouse gas emissions by as much as 10 tons annually, when compared to an equivalent diesel-powered vehicle. The Navistar electric vehicle has a Gross Vehicle Weight (GVW) rating of 12,100 pounds and a payload capacity of two tons. The vehicle will be assembled in Wakarusa, Indiana, and is scheduled for launch in mid-2010.

A123’s battery pack will enable the Navistar electric vehicle to travel a distance of approximately 100 miles on pure electricity before needing to be recharged. The battery pack will be capable of a rapid charge rate and will have a charge time dependent on the power of the charging system applied.

A123 Systems also has agreements with Fisker Automotive and China’s largest automaker, SAIC Motor Co.

Website: http://www.a123systems.com     
(Visited 4,144 times, 61 visits today)

Post Your Comment

Your email address will not be published. Required fields are marked *